Bethany Road Project

PROJECT SUMMARY
Location: Deerfield Township
Cost:
Status: Completed
Start Date:
End Date:
Project Participants:
Scope: Drainage improvements have been made along Bethany Road from Chanticleer Lane to Windemere Way, and the Bethany Road bridge over the tributary of the Little Muddy Creek has been replaced. Drainage improvements included various elements to help improve the flow and accumulation of water during periods of heavy rain.
Improvements included replacing the drainage pipes that run along local driveways in the project area, storm sewer installation and sewer line repairs, a water main relocation, and re-grading ditches. The new culvert (drainage infrastructure) was extended to the north to accommodate a future bike path that will be built next year.